OSSO

← Oct 25

Journal: Monday, Oct 26, 2026

  1. 2026-10-26: Enclosure v2, inlets on the right, manual focus (the designer)
  2. 2026-10-26 (later): Door shrunk to the load/unload opening (the designer)
  3. 2026-10-26 run 3 (the designer's queued items)
  4. 2026-10-26 run 4 + 4b (the designer)
  5. 2026-10-26 run 5 (the designer's 13 items, resume after interruptions)
  6. Oct 26, 2026 (afternoon, EDT): run 5 batch D

2026-10-26: Enclosure v2, inlets on the right, manual focus (the designer)

Oct 26, 2026 · #

2026-10-26 (later): Door shrunk to the load/unload opening (the designer)

Oct 26, 2026 · #

2026-10-26 run 3 (the designer's queued items)

Oct 26, 2026 · #

2026-10-26 run 4 + 4b (the designer)

Oct 26, 2026 · #

2026-10-26 run 5 (the designer's 13 items, resume after interruptions)

Oct 26, 2026 · #

Oct 26, 2026 (afternoon, EDT): run 5 batch D

Oct 26, 2026 · #